
|
Farmland Hydro, L.P. Dam, east FloridaFarmland Hydro, L.P. Dam is in Polk County, Florida. Construction was completed in 1965. At normal levels it has a surface area of 181 acres. It is owned by Farmland Hydro. Farmland Hydro, L.p. Dam is of earthen construction. Its height is 25 feet with a length of 11000 feet. Maximum discharge is 215 cubic feet per second. Its capacity is 2454.74 acre feet. Normal storage is 1944.47 acre feet. It drains an area of 0.78 square miles.
Lakes, Dams, and Recreational Facilities Near Farmland Hydro, L.P. Dam Bradley Junction 1 Bradley Jxn 2 Bradley Jxn 6 Bradley Jxn 5 Bradley Jxn 3 Bradley Junction S Settling Area No 1 Bradley Jxn 4 P-5 Bradley Junction E (Ctr) P-4 Bradley Junction S (Ctr) Bradley Junction N (Ctr) Bradley Junction Nw Mulberry N Phosphoria P-1 Bradley Junction Ne Settling Area No 2 Settling Area No 3 Cf Industries Bartow Complex Dam Bradley Junction W (Ctr) Fort Green Fg-3 Area Br 2 Watson Sa N09 Bowlegs Hancock Lake Settling Area B Dike Palmetto Settling Area No 2 Palmetto Settling Area No 3 Palmetto Settling Area No 4 Palmetto Settling Area No 5 Palmetto Settling Area No 6 Palmetto Clar. Area No 1 Palmetto Clar. Area No 2 Fort Green Fg-2 Clay Settling Area Bl Clay Settling Area Al Big Four Mine Bf-1 Es-tech Sa-12 Es-tech Sa-13 Palmetto Settling Area No 1
Bookmark this lake location.
Find other east Florida area lakes
and vacation ideas or return to the home page.
|